If the bond passes on November 6, 2018, the plan is to replace Lynch with a brand new, modern and safe school. Built in 1965, Lynch isn’t our oldest building but it was poorly built and questions about its long-term viability really came to light after the winter of 2016-17. Several feet of piled up snow caused the roof to sag, leading to a closure of the school for several days to remove the snow.

The safety of our students and staff is too important: it’s time to replace the building with a new school designed for 21st Century learners.

Read more about the bond plan at redmondschoolbond.org.